NCSU Oval Drive Utilities
NCSU Oval Drive Utilities Site work for this project includes utility connections (water, sewer, chilled water, steam, and stormwater) to Centennial Campus precinct infrastructure. Back to Projects → Previous Next
Duke Raleigh Hospital
Duke Raleigh Hospital Pipeline Utilities, Inc. was selected to be part of the Robins & Morton design-build team for construction of a new inpatient tower and central energy plant at Duke Hospital in Raleigh, North Carolina. As the Site contractor for this project, our duties include excavation for the tower, site grading and drainage, utilities, […]
Hillsborough Street Revitalization
Hillsborough Street Revitalization This project is designed to enhance the transformation of the area allowing for opportunities for cultural events, social gatherings and businesses. The work includes roundabouts and medians, buffered bike lanes and bike racks, improved transit shelters and signage and a rain garden. Also, public water and sewer, erosion control, curb & gutter, […]
Novo Nordisk Pharmaceuticals
Novo Nordisk Pharmaceuticals The work completed at Novo Nordisk in Clayton, NC was a sitework package that included grading, paving and utility work . This scope entailed retaining walls, curb & gutter, asphalt patch, waterline relocation, extension of sanitary sewer, storm drain work, temporary utilities, a new access drive and reconstruction of the plant entrance […]
Boshamer Stadium Emergency Storm Repair
Boshamer Stadium Emergency Storm Repair This UNC-CH project included emergency repair/replacement of a failing stormwater line under UNC’s baseball field. It involved a 30-foot deep trench with shoring to install 300-feet of 72-inch reinforced concrete pipe (RCP) bedded on rock. Stadium renovations were conducted concurrently with this project which restricted the amount of space available […]