This UNC-CH project included emergency repair/replacement of a failing stormwater line under UNC’s baseball field. It involved a 30-foot deep trench with shoring to install 300-feet of 72-inch reinforced concrete pipe (RCP) bedded on rock. Stadium renovations were conducted concurrently with this project which restricted the amount of space available to perform the work, as well as required the work to be performed in a short amount of time as not to affect the renovations to the field.