Certainteed Plant Utilities In addition to a water intake structure on the river, this project included approximately 7,000 lf. of 14” fire main, 2,800 lf of process water, 1,500 lf of 2” sanitary sewer force main, 400’ of 6” ductile iron pipe resting on precast concrete piers for an aerial crossing, 1,600 lf of 6” […]

Jenks Rd Waterline Relocation

Jenks Rd Waterline

Jenks Rd Waterline Relocation This project included relocation of 42″ and 30″ water main required for the construction of I-540. Back to Projects → Previous Next

UNC-CH Cogen Steam Tunnel Replacement

Cogen Steam

UNC-CH Cogen Steam Tunnel Replacement The UNC steam tunnel replacement project involved constructing over 2,000 linear feet of new underground cast-in-place concrete tunnel to replace an existing walkable tunnel dating to 1939 with major structural failure and asbestos insulation as well as and an accessible tunnel built in 1987. This new tunnel provides low- and […]

Boshamer Stadium Emergency Storm Repair

Boshamer Storm Drain

Boshamer Stadium Emergency Storm Repair This UNC-CH project included emergency repair/replacement of a failing stormwater line under UNC’s baseball field. It involved a 30-foot deep trench with shoring to install 300-feet of 72-inch reinforced concrete pipe (RCP) bedded on rock. Stadium renovations were conducted concurrently with this project which restricted the amount of space available […]