NCSU Oval Drive Utilities

NCSU Oval Drive Utilities

NCSU Oval Drive Utilities Site work for this project includes utility connections (water, sewer, chilled water, steam, and stormwater) to Centennial Campus precinct infrastructure. Back to Projects → Previous Next

Uncle Bob’s Self Storage (Life Storage)

Uncle Bob's Self Storage (Life Storage)

Uncle Bob’s Self Storage (Life Storage) This project includes installation of 541 feet of new fire line to the storage facility. A bore & jack is required to get the new piping across a busy Durham street. It also includes an 8″ backflow device, multiple fittings and valves, and asphalt pavement restoration. Back to Projects […]

Cary Waterline Replacement

Cary Waterline Replacement

Cary Waterline Replacement This Cary, NC project includes the installation of 11,160 feet of new 4″, 6″, and 8″ ductile iron waterline, 14 new fire hydrant assemblies, 51 new gate valves, and 160 water service connections. Also included is the abandonment of 11,580 feet of existing waterline and 5,220 square yards of asphalt trench repair. […]

Duke Raleigh Hospital

Duke Raleigh Hospital

Duke Raleigh Hospital Pipeline Utilities, Inc. was selected to be part of the Robins & Morton design-build team for construction of a new inpatient tower and central energy plant at Duke Hospital in Raleigh, North Carolina. As the Site contractor for this project, our duties include excavation for the tower, site grading and drainage, utilities, […]

Hillsborough Street Revitalization

Hillsborough Street Revitalization

Hillsborough Street Revitalization This project is designed to enhance the transformation of the area allowing for opportunities for cultural events, social gatherings and businesses. The work includes roundabouts and medians, buffered bike lanes and bike racks, improved transit shelters and signage and a rain garden. Also, public water and sewer, erosion control, curb & gutter, […]

Novo Nordisk Pharmaceuticals

Novo Nordisk Pharmaceuticals The work completed at Novo Nordisk in Clayton, NC was a sitework package that included grading, paving and utility work . This scope entailed retaining walls, curb & gutter, asphalt patch, waterline relocation, extension of sanitary sewer, storm drain work, temporary utilities, a new access drive and reconstruction of the plant entrance […]

Certainteed Plant Utilities

Certainteed Plant Utilities

Certainteed Plant Utilities In addition to a water intake structure on the river, this project included approximately 7,000 lf. of 14” fire main, 2,800 lf of process water, 1,500 lf of 2” sanitary sewer force main, 400’ of 6” ductile iron pipe resting on precast concrete piers for an aerial crossing, 1,600 lf of 6” […]

Jenks Rd Waterline Relocation

Jenks Rd Waterline

Jenks Rd Waterline Relocation This project included relocation of 42″ and 30″ water main required for the construction of I-540. Back to Projects → Previous Next