NCSU Oval Drive Utilities
NCSU Oval Drive Utilities Site work for this project includes utility connections (water, sewer, chilled water, steam, and stormwater) to Centennial Campus precinct infrastructure. Back to Projects → Previous Next
UNC Academic Affairs Utility Improvements
UNC Academic Affairs Utility Improvements This project involved replacement of thermal utilities – chilled water and steam – serving multiple buildings on the UNC Chapel Hill campus. Also included was the replacement of storm water drainage near Swain and Lenoir Drive. Back to Projects → Previous Next
UNC-CH Cogen Steam Tunnel Replacement
UNC-CH Cogen Steam Tunnel Replacement The UNC steam tunnel replacement project involved constructing over 2,000 linear feet of new underground cast-in-place concrete tunnel to replace an existing walkable tunnel dating to 1939 with major structural failure and asbestos insulation as well as and an accessible tunnel built in 1987. This new tunnel provides low- and […]