NCSU Oval Drive Utilities

NCSU Oval Drive Utilities

NCSU Oval Drive Utilities Site work for this project includes utility connections (water, sewer, chilled water, steam, and stormwater) to Centennial Campus precinct infrastructure. Back to Projects → Previous Next

UNCG South Chiller Plant (Site Piping)

UNCG South Chiller Plant (Site Piping)

UNCG South Chiller Plant (Site Piping) This scope of work involved connecting to existing 24″ supply/return chilled water piping and installing 230 LF of new 30″ piping to the proposed chiller plant building. Pressure testing and jetting/flushing of the new piping was also completed. Back to Projects → Previous Next

UNC Academic Affairs Utility Improvements

UNC Academic Affairs Utility Improvements

UNC Academic Affairs Utility Improvements This project involved replacement of thermal utilities – chilled water and steam – serving multiple buildings on the UNC Chapel Hill campus. Also included was the replacement of storm water drainage near Swain and Lenoir Drive. Back to Projects → Previous Next