NCSU Oval Drive Utilities
![NCSU Oval Drive Utilities](https://pui-nc.com/wp-content/uploads/2022/10/oval_400x300.jpg)
NCSU Oval Drive Utilities Site work for this project includes utility connections (water, sewer, chilled water, steam, and stormwater) to Centennial Campus precinct infrastructure. Back to Projects → Previous Next
UNCG South Chiller Plant (Site Piping)
![UNCG South Chiller Plant (Site Piping)](https://pui-nc.com/wp-content/uploads/2022/10/uncg_CP_400x300.jpg)
UNCG South Chiller Plant (Site Piping) This scope of work involved connecting to existing 24″ supply/return chilled water piping and installing 230 LF of new 30″ piping to the proposed chiller plant building. Pressure testing and jetting/flushing of the new piping was also completed. Back to Projects → Previous Next
UNC Academic Affairs Utility Improvements
![UNC Academic Affairs Utility Improvements](https://pui-nc.com/wp-content/uploads/2022/10/aa1-400x300-1.jpg)
UNC Academic Affairs Utility Improvements This project involved replacement of thermal utilities – chilled water and steam – serving multiple buildings on the UNC Chapel Hill campus. Also included was the replacement of storm water drainage near Swain and Lenoir Drive. Back to Projects → Previous Next