Kilmayne Elevated Water Tank
This Town of Cary, NC project included the construction of a new 2 million gallon elevated water storage tank.  Pipeline Utilties, Inc. was subcontracted to install the offsite water main Improvements within the rightof-way and the 24-inch water main within the tank site.  Our scope of work includes the installation of approximately 1,197 LF of 16-inch restrained joint DIP water main, 119 LF of 24-inch restrained joint DIP water main, new gate valves, and pavement repair.